Equipment installation begins at TSMC’s 2nm Kaohsiung fab
Taipei, Nov. 26 (CNA) Taiwan Semiconductor Manufacturing Co. (TSMC) began installing equipment at its 2-nanometer fab in Kaohsiung, paving the way for a trial run at the company’s second plant featuring it most advanced technology in the first half of 2025.