• 09/22/2024

Mekorot begins operation of water line joining Beersheva with Shoket drilling area

Jerusalem Post


Mekorot has begun work on a large project that is intended to increase the supply of water along the Beer Sheba route.

https://www.jpost.com/israel-news/article-746300