• 11/26/2024

Power engineers restore power to critical infrastructure in Kryvyi Rih district – photo

Pravda Ukraine

Power supply to critical infrastructure in Kryvyi Rih and adjacent areas has been restored, after being cut off by Russian shelling.

Source: Volodymyr Kudrytskyi, Chairman of the Board of NPC Ukrenergo, on Facebook

Quote from Kudrytskyi: “Work to restore power to consumers in Kryvyi Rih and the adjacent areas is ongoing; today (4 February – ed.) I visited all the damaged facilities. As of now, the repair crews have fulfilled their main task – to supply power to critical infrastructure and household consumers as soon as possible – and we are very grateful to them, as well as to our colleagues from the distribution networks and the local power plant.”

Details: He added that work to restore the power supply continues around the clock.

 

PHOTO: VOLODYMYR KUDRYTSKYI FACEBOOK 

Electrical engineers continue to restore high-voltage equipment, test the function of the surviving equipment, and select replacements for the destroyed equipment from the emergency stockpile which, according to Kudrytskyi, was built up throughout 2023.

 

PHOTO: VOLODYMYR KUDRYTSKYI FACEBOOK 

“In the coming days, we will definitely be here again; we have specific plans to increase the reliability of the electricity supply,” concluded the CEO of Ukrenergo.

Background:

Support UP or become our patron!

https://www.pravda.com.ua/eng/news/2024/02/5/7440393/